Section titled “Phase 1 — Physical setup”1.1 Placement
Section titled “1.1 Placement”- Place the machine on a flat, stable surface
- The G1 rests on aluminum feet already mounted under the bottom aluminum strips — no base pallet needed
- Allow at least 50 cm clearance on all sides for the tube and vacuum unit
- Place the pellet bucket close to the machine — the shorter the corrugated tube, the better (max 1.5 m)
1.2 Electrical connections
Section titled “1.2 Electrical connections”The power box (under the panel box, on the right side of the printer) has three power sockets, labelled from the top:
- Forced (always-on): general purpose / free for low-consumption accessories only (laptop charger, camera) — never high-power loads
- Feeding (feeding-controlled): for the vacuum pump — the printer turns it on/off automatically
- Bed (firmware-controlled): reserved for the bed heater — connect ONLY the bed heater cable here
Do NOT plug the bed heater into the Forced socket (always-on). Plugging it there causes the bed to heat uncontrolled and trips the safety at 110°C.
See Bed heater on wrong outlet and Power outlets (power box) for detail.
1.3 Vacuum voltage check
Section titled “1.3 Vacuum voltage check”- EU machines (220–240V): use the supplied 220V vacuum
- Non-EU machines (110V regions): use a 110V vacuum — never plug a 110V vacuum into a 220V socket
- If you only have a 220V machine in a 110V region: use a step-down transformer between the socket and the vacuum
1.4 Emergency stop
Section titled “1.4 Emergency stop”Check that the red mushroom button on the front is released (twist and pull up). If it’s pressed, the machine will not power on. See Machine won’t start - emergency button.
Phase 1B — First power-on checks (G1 First Kick-Off)
Section titled “Phase 1B — First power-on checks (G1 First Kick-Off)”These checks are from the official assembly manual “G1 First Kick Off” section:
- Connect the 2 power cables to the main plugs and turn them on — the 2 red LEDs on the plugs will turn on and the printer will power up
- Check that the Panel and Screen turn on correctly
- Check that the fans under the Panel, on the Power Box, and at the entrance of the extruder freely rotate
Phase 2 — Network and software
Section titled “Phase 2 — Network and software”2.0 Homing and motor checks (do before WiFi setup)
Section titled “2.0 Homing and motor checks (do before WiFi setup)”- From the display, use the “Move” menu → Home All to perform the first homing
- Verify that all 4 Z motors spin correctly in the same direction
- Verify that all 2 Y motors spin correctly in the same direction
- Verify that the X motor spins correctly in the homing direction
- Verify that the Z probe sensor correctly deploys and that its microswitch is correctly positioned to touch the bed
2.1 Connect to WiFi
Section titled “2.1 Connect to WiFi”- On the display, open the WiFi menu to find your network settings
- Connect to your local WiFi network from the WiFi menu
- Find the printer IP in the System menu on the display
- Type the IP address in your browser — the Mainsail control panel appears
- Alternatively, find the IP via your router’s connected devices list
2.2 Install Ginger Slicer
Section titled “2.2 Install Ginger Slicer”- Download from gingeradditive.com/software
- Install and launch
- Select your nozzle size and a starting material profile
- Connect to the printer via IP address (same local network)
Phase 2B — First heating and extrusion
Section titled “Phase 2B — First heating and extrusion”2B.1 Heating up
Section titled “2B.1 Heating up”- Preheat the extruder and the heated bed to the proper “Temperature” for your material
- Note: the extruder has been tested at the factory with PLA, so the barrel still has material inside. Temperature may take several minutes to reach the set value.
- Allow the extruder to reach temperature completely before attempting any extrusion
2B.2 First extrusion
Section titled “2B.2 First extrusion”- When the extruder is at temperature, perform a first extrusion via the “Extrude” menu
- Check that E0 Main Extruder motor and E1 Hopper motor spin in the correct direction (arrows on the extruder indicate correct direction)
- To activate the automatic feeding system, use the FEEDER toggle in the “Extrude” menu
- Be aware that activation of the FEEDER is enabled after the end of the extrusion command — there is a short delay before pellets begin moving
Phase 3 — First calibrations (do these before first print)
Section titled “Phase 3 — First calibrations (do these before first print)”3.1 Check firmware version
Section titled “3.1 Check firmware version”In Mainsail → Update Manager — update any pending components.
3.2 Bed leveling
Section titled “3.2 Bed leveling”- Heat the extruder to printing temperature (e.g. 200°C for PLA)
Always heat before running bed leveling — cold material on the nozzle tip can trigger the probe early and give a wrong mesh
- From the printer display: Macros → Bed Leveling
- Wait for the full mesh to complete (1–3 minutes)
- Save the result from the display
3.3 Z offset
Section titled “3.3 Z offset”- After bed leveling, start a test print (single skirt line)
- Adjust Z offset live from the display while the first line prints
- Target: first line slightly flattened (~80% of its height), touching the bed firmly
- Save when happy — if you don’t save, the value resets on restart
See Z offset and first layer for the full procedure.
3.4 Rotation Volume calibration
Section titled “3.4 Rotation Volume calibration”- Load your material and heat to temperature
- Print a single skirt/purge line
- Measure the line width with a caliper
- Adjust Rotation Volume in the material profile until width matches what the slicer targets
See Rotation Volume calibration for the full procedure.
Phase 4 — First print
Section titled “Phase 4 — First print”Pre-print checklist
Section titled “Pre-print checklist”- Emergency stop button released (not pressed)
- Bed heater cable in the bed socket (power box)
- Vacuum pump in the feeding socket (power box)
- Pellets loaded and hopper has material
- Corrugated tube clamped tight at both ends
- Extruder heated to target temperature
- Bed leveling mesh saved
- Z offset saved
- Rotation Volume calibrated for this material
Starting the print
Section titled “Starting the print”- Send the G-code from Ginger Slicer (preferred) — this allows live monitoring and error display
- Alternatively, upload the file to Mainsail → print from the Files tab
- Watch the first 2–3 layers closely: first layer quality determines the whole print
Common first-boot issues
Section titled “Common first-boot issues”| Symptom | Cause | Fix |
|---|---|---|
| Machine won’t turn on | Emergency stop pressed | Twist and release the red button |
| Bed heats to 110°C then errors | Bed cable in wrong outlet | Move cable to the bed socket |
| Vacuum not running | Not plugged into feeding socket | Move vacuum to the feeding socket |
| No WiFi hotspot | Machine not fully booted | Wait 60 s, try again |
| First layer too high / not sticking | Z offset not set | Run Z offset calibration and save |
| First layer blobs / over-extruded | Rotation Volume too low | Increase Rotation Volume |
| Print starts rough then improves | Previous material purging | Normal — run longer purge line |